This is definitely the phrase of the day.
Archive for July 1st, 2009
Comments Off
To Do List
2009
07.01
07.01
- Get the first floor bathroom in working order. That means fixing the toilet, painting the ceiling & walls, and installing the sink & vanity.
- Finish setting up the home theater. Everything has been disconnected to get the wall mount for the A/V components sorted out. Now I need to rewire my 5.1 system and, at a minimum, get all the cables run even if they will wind up exposed (for now). Later, I have to make the decision about installing a raceway or snaking cables through the walls. Right now, I’m thinking of passing all A/V cables from the PS3, Wii, and DirecTV box through the walls, but I probably won’t re-route power.
- When the office was painted, I sort of piled everything up on my computer desk. This needs to get reorganized and completely cleaned up from top to bottom. Clutter is the enemy!



