- Get the first floor bathroom in working order. That means fixing the toilet, painting the ceiling & walls, and installing the sink & vanity.
- Finish setting up the home theater. Everything has been disconnected to get the wall mount for the A/V components sorted out. Now I need to rewire my 5.1 system and, at a minimum, get all the cables run even if they will wind up exposed (for now). Later, I have to make the decision about installing a raceway or snaking cables through the walls. Right now, I’m thinking of passing all A/V cables from the PS3, Wii, and DirecTV box through the walls, but I probably won’t re-route power.
- When the office was painted, I sort of piled everything up on my computer desk. This needs to get reorganized and completely cleaned up from top to bottom. Clutter is the enemy!
Comments Off
To Do List
2009
07.01
07.01


